Moravian Command Center
The SPSI operating system
Powered by Rhodes Advisors

One operating picture for SPSI

MU Prism unifies Salesforce, GA4, paid media, the SIS, and Oracle finance into a single data layer, and each team runs its day from its own command. Pick a command to begin. The Business Plan Command runs on real model data today; the four operating commands are illustrative prototypes pending MU Prism feeds.

SPSI Finance Command

Anna
Command ownerAnna
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
Oracle GL ▸ MU Prism (simulated)Program budgets ▸ MU Prism (simulated)AP / invoices ▸ MU Prism (simulated)

Recommended actions

AI GENERATED · ILLUSTRATIVE

FY27 to date, budget vs actual by month

Revenue and expenses recognized July through October FY27. Budget comparison by category sits in the table below.

RevenueExpensesNet

FYTD contribution by program

Revenue less direct costs, July through October.

Expense integrity watch

Allocation checks that keep non-SPSI expenses off SPSI's books.

FYTD expenses by category, budget vs actual

SPSI Marketing Command

Nicole
Command ownerNicole
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
GA4 ▸ MU Prism (simulated)Paid media via Windsor ▸ MU Prism (simulated)Salesforce leads ▸ MU Prism (simulated)

Recommended actions

AI GENERATED · ILLUSTRATIVE

Weekly inquiries, trailing 12 weeks

All programs, paid and organic combined, against the weekly inquiry goal. SP27 push began week of Sep 7.

ActualGoal

Spend pacing by channel, FYTD

Actual spend against pro-rated FY27 budget.

Cost per lead by program vs plan

Dashed marker shows plan CPL.

Site funnel, FYTD

SPSI Enrollment Command

Lauren
Command ownerLauren
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
SIS registration ▸ MU Prism (simulated)Salesforce ▸ MU Prism (simulated)Term census ▸ MU Prism (simulated)

Recommended actions

AI GENERATED · ILLUSTRATIVE

SP27 registration pace, cumulative by week

Registrations against the SP27 target (held at 80 percent of plan in the August re-forecast). Census is January 20.

SP27 actualSP26 same week last cycle

SP27 registration by program

Retention and melt

FA26 cohort term-to-term persistence and deposit-to-start melt.

Stop-out watch. 9 continuing students have not registered for SP27 and show no activity in 14 days.

SPSI Academic Command

DeeAmy
Command ownersDee & Amy
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
Application platform ▸ MU Prism (simulated)SIS sections ▸ MU Prism (simulated)Course development tracker ▸ MU Prism (simulated)

Recommended actions

AI GENERATED · ILLUSTRATIVE

FA27 admissions pipeline by program

Applications, completed files, admits, and deposits for the Fall 2027 cycle (early).

Decision turnaround, weekly median

Days from completed file to decision. Standard: 2 business days.

Section enrollment · SP27

ILLUSTRATIVE · DUMMY DATA

SP27 section fill

Enrollment per section against the minimum viable enrollment (MVE) and 25 cap.

10 lowest-enrolled sections

Net enrolled, lowest first, with gap to MVE.

SP27 sections against MVE

Every scheduled section: MVE threshold (8 for 3-4 credit courses, 4 for 2-credit), gap to MVE, percent of the 25-seat cap, and days until the session starts. Sorted by gap, most at risk first.

Course build pipeline

Builds and revisions due before SP27 and FA27 starts.

Dean’s Office reports

ILLUSTRATIVE · DUMMY DATA

Cohort, headcount, retention, and stop-out reporting for the Dean’s office. Illustrative dummy data pending MU Prism feeds.

Definitions used in every view on this page
  • Cohort: new students at semester start, RDNS excluded.
  • RDNS (registered, did not start): registered with no coursework engagement by the census date for the course format. 16-week: third Friday. 8-week: Friday of week 2. 4-week: Friday of week 1.
  • Net enrolled: registered minus RDNS, locked at census and never recalculated. The denominator for every rate on this page.
  • Full-time: 12+ credits undergraduate, 9+ graduate, summed across sub-terms in the semester. MVE: 8 students for 3-4 credit courses, 4 for 2-credit.
SPSI’s first intake was FA25, so six-semester views show four censused semesters; SP27 and SU27 fill in as each census locks.

Cohort & headcount

Cohort size by term and program

Entering cohort (net enrolled, RDNS excluded) per semester, against the same semester a year earlier. Programs down more than 10 percent year over year are flagged in red.

Entering cohortSame semester, prior year

RDNS / forfeited enrollment

Registered students with no coursework engagement by their format’s census date, by term, program, and course format. Click a row for the student-level roster.

Net enrolled headcount, year over year

Official census headcount: entering cohort, continuing, and total.

Figures lock at each census and are never recalculated.

Entering cohort vs continuing

Net enrolled by semester. Flag: entering cohort under 20 percent of total.

Entering cohortContinuing

Full-time vs part-time, FA26

Net enrolled by program and level. Full-time: 12+ credits undergraduate, 9+ graduate. Programs over 50 percent part-time are flagged in red.

Full-timePart-time

Retention & persistence

Term-to-term persistence

Each entering cohort tracked across later terms: students still enrolled at each census, as a rate of the cohort’s locked census count. Summer is optional, so summer rates run lower.

Fall-to-fall retention

Share of each fall cohort enrolled at the next fall census, by program.

Stop-outs: withdrawals and leaves of absence

Formal withdrawals and LOAs by semester. Click a semester for the roster.

SPSI Business Plan Command

BryonLee
Command ownersBryon & Lee

Recommended actions

AI GENERATED · ILLUSTRATIVE

Consolidated plan

August 2026 re-forecast. Moravian's fiscal year closes July 1, so FY26 is locked: closed years report actuals, everything to the right of the divider is forecast. Financials are fiscal year contribution; enrollment runs on academic terms. Cyber was shut down in April 2026 and is out of the plan. Certificates are not yet included.

Revenue, expenses, and net surplus by fiscal year

RevenueExpensesNet surplus

Operating margin %

SPSI target zone shaded at 35 to 40 percent.

Cumulative net surplus

FY26 scorecard, forecast vs actual

Consolidated plan table

Enrollment, plan vs actual

FA26 goals against students actually enrolled as of late August, with SP27 and SU27 intakes held at 80 percent of target in the re-forecast. CG program intakes are largely deferred to FA27.

FA26 intake, goal vs enrolled

GoalEnrolled

Intake detail

Programs

Six active core programs plus Aviation, which the August report carries as one combined line (BS Aviation Management + BS Professional Pilot). Financials are the August re-forecast. Term-level intake forecasts and funnel levers were not re-forecast in August and are shown from the May models, labeled.

FY27 revenue contribution by program

Revenue each program contributes to FY27 and its share of the total. New programs added to the plan will appear here with their FY27 addition.

Program scorecard, FY27

Marketing and funnel May 2026 assumptions

The August report did not re-forecast CPL, lead-to-enroll, or media budgets. Everything below is from the May 2026 models and should be treated as stale until Anna's next full model drop. The AA programs run through CG Spectrum with no paid media.

Per-student LTV, FY26 goal vs actual (August report)

The one funnel-adjacent metric August did update. Blended LTV per student came in at $24,691 vs $27,652 forecast, driven by the MBA tuition redesign and the Cyber shutdown.

Media budget by program, FY27 May

Funnel levers by model year May

CPL and lead-to-enroll as set in the May models.

Break-even

From the August re-forecast. Annual break-even is the first fiscal year a program covers its own costs; payback is the first year cumulative surplus turns positive (measured from FY26).

Peak cumulative investment by program, FY26-FY31

Break-even detail

Version history

Three versions to date. Each model drop from the team becomes a version; figures and assumption changes are tracked version over version.

Net surplus trajectory across versions

Consolidated net surplus, FY26 through FY32. Dec 2025 and May 2026 are plan; Aug 2026 starts from the FY26 actual.

Aug 2026May 2026Dec 2025

Key variances, May 2026 vs Aug 2026

Total with Aviation. The August cut reflects FA26 under-enrollment (63 vs 92 goal), the Cyber shutdown, the MBA tuition redesign, and SP27/SU27 held at 80 percent of target.

Chassis note. The August re-forecast was built on the December 2025 straight-line chassis rather than the May cohort-matrix model, and its own term table assigns summers to the next fiscal year. This dashboard holds to the standing convention (FY27 = FA26 + SP27 + SU27), which the August headline tables also use, so figures here tie to those headline tables. Standing data rule: Moravian's FY closes July 1, so closed fiscal years must be reported as actuals only; modeled figures for a closed year are flagged, never presented as results.