This prototype is access-protected. Enter the password to continue.
That password is not right.
Moravian Command Center
The SPSI operating system
Powered by Rhodes Advisors
One operating picture for SPSI
MU Prism unifies Salesforce, GA4, paid media, the SIS, and Oracle finance into a single data layer, and each team runs its day from its own command. Pick a command to begin. The Business Plan Command runs on real model data today; the four operating commands are illustrative prototypes pending MU Prism feeds.
SPSI Finance Command
Command ownerAnna
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
Oracle GL ▸ MU Prism (simulated)Program budgets ▸ MU Prism (simulated)AP / invoices ▸ MU Prism (simulated)
Recommended actions
AI GENERATED · ILLUSTRATIVE
FY27 to date, budget vs actual by month
Revenue and expenses recognized July through October FY27. Budget comparison by category sits in the table below.
RevenueExpensesNet
FYTD contribution by program
Revenue less direct costs, July through October.
Expense integrity watch
Allocation checks that keep non-SPSI expenses off SPSI's books.
FYTD expenses by category, budget vs actual
SPSI Marketing Command
Command ownerNicole
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
GA4 ▸ MU Prism (simulated)Paid media via Windsor ▸ MU Prism (simulated)Salesforce leads ▸ MU Prism (simulated)
Recommended actions
AI GENERATED · ILLUSTRATIVE
Weekly inquiries, trailing 12 weeks
All programs, paid and organic combined, against the weekly inquiry goal. SP27 push began week of Sep 7.
ActualGoal
Spend pacing by channel, FYTD
Actual spend against pro-rated FY27 budget.
Cost per lead by program vs plan
Dashed marker shows plan CPL.
Site funnel, FYTD
SPSI Enrollment Command
Command ownerLauren
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
SIS registration ▸ MU Prism (simulated)Salesforce ▸ MU Prism (simulated)Term census ▸ MU Prism (simulated)
Recommended actions
AI GENERATED · ILLUSTRATIVE
SP27 registration pace, cumulative by week
Registrations against the SP27 target (held at 80 percent of plan in the August re-forecast). Census is January 20.
SP27 actualSP26 same week last cycle
SP27 registration by program
Retention and melt
FA26 cohort term-to-term persistence and deposit-to-start melt.
Stop-out watch. 9 continuing students have not registered for SP27 and show no activity in 14 days.
SPSI Academic Command
Command ownersDee & Amy
ILLUSTRATIVE PROTOTYPEAll figures on this page are dummy data for demonstration only. In production this command runs on live feeds from MU Prism, the SPSI data layer.
Application platform ▸ MU Prism (simulated)SIS sections ▸ MU Prism (simulated)Course development tracker ▸ MU Prism (simulated)
Recommended actions
AI GENERATED · ILLUSTRATIVE
FA27 admissions pipeline by program
Applications, completed files, admits, and deposits for the Fall 2027 cycle (early).
Decision turnaround, weekly median
Days from completed file to decision. Standard: 2 business days.
Section enrollment · SP27
ILLUSTRATIVE · DUMMY DATA
SP27 section fill
Enrollment per section against the minimum viable enrollment (MVE) and 25 cap.
10 lowest-enrolled sections
Net enrolled, lowest first, with gap to MVE.
SP27 sections against MVE
Every scheduled section: MVE threshold (8 for 3-4 credit courses, 4 for 2-credit), gap to MVE, percent of the 25-seat cap, and days until the session starts. Sorted by gap, most at risk first.
Course build pipeline
Builds and revisions due before SP27 and FA27 starts.
Dean’s Office reports
ILLUSTRATIVE · DUMMY DATA
Cohort, headcount, retention, and stop-out reporting for the Dean’s office. Illustrative dummy data pending MU Prism feeds.
Definitions used in every view on this page
Cohort: new students at semester start, RDNS excluded.
RDNS (registered, did not start): registered with no coursework engagement by the census date for the course format. 16-week: third Friday. 8-week: Friday of week 2. 4-week: Friday of week 1.
Net enrolled: registered minus RDNS, locked at census and never recalculated. The denominator for every rate on this page.
Full-time: 12+ credits undergraduate, 9+ graduate, summed across sub-terms in the semester. MVE: 8 students for 3-4 credit courses, 4 for 2-credit.
SPSI’s first intake was FA25, so six-semester views show four censused semesters; SP27 and SU27 fill in as each census locks.
Cohort & headcount
Cohort size by term and program
Entering cohort (net enrolled, RDNS excluded) per semester, against the same semester a year earlier. Programs down more than 10 percent year over year are flagged in red.
Entering cohortSame semester, prior year
RDNS / forfeited enrollment
Registered students with no coursework engagement by their format’s census date, by term, program, and course format. Click a row for the student-level roster.
Net enrolled headcount, year over year
Official census headcount: entering cohort, continuing, and total.
Figures lock at each census and are never recalculated.
Entering cohort vs continuing
Net enrolled by semester. Flag: entering cohort under 20 percent of total.
Entering cohortContinuing
Full-time vs part-time, FA26
Net enrolled by program and level. Full-time: 12+ credits undergraduate, 9+ graduate. Programs over 50 percent part-time are flagged in red.
Full-timePart-time
Retention & persistence
Term-to-term persistence
Each entering cohort tracked across later terms: students still enrolled at each census, as a rate of the cohort’s locked census count. Summer is optional, so summer rates run lower.
Fall-to-fall retention
Share of each fall cohort enrolled at the next fall census, by program.
Stop-outs: withdrawals and leaves of absence
Formal withdrawals and LOAs by semester. Click a semester for the roster.
SPSI Business Plan Command
Command ownersBryon & Lee
Recommended actions
AI GENERATED · ILLUSTRATIVE
Consolidated plan
August 2026 re-forecast. Moravian's fiscal year closes July 1, so FY26 is locked: closed years report actuals, everything to the right of the divider is forecast. Financials are fiscal year contribution; enrollment runs on academic terms. Cyber was shut down in April 2026 and is out of the plan. Certificates are not yet included.
Revenue, expenses, and net surplus by fiscal year
RevenueExpensesNet surplus
Operating margin %
SPSI target zone shaded at 35 to 40 percent.
Cumulative net surplus
FY26 scorecard, forecast vs actual
Consolidated plan table
Enrollment, plan vs actual
FA26 goals against students actually enrolled as of late August, with SP27 and SU27 intakes held at 80 percent of target in the re-forecast. CG program intakes are largely deferred to FA27.
FA26 intake, goal vs enrolled
GoalEnrolled
Intake detail
Programs
Six active core programs plus Aviation, which the August report carries as one combined line (BS Aviation Management + BS Professional Pilot). Financials are the August re-forecast. Term-level intake forecasts and funnel levers were not re-forecast in August and are shown from the May models, labeled.
FY27 revenue contribution by program
Revenue each program contributes to FY27 and its share of the total. New programs added to the plan will appear here with their FY27 addition.
Program scorecard, FY27
Marketing and funnel May 2026 assumptions
The August report did not re-forecast CPL, lead-to-enroll, or media budgets. Everything below is from the May 2026 models and should be treated as stale until Anna's next full model drop. The AA programs run through CG Spectrum with no paid media.
Per-student LTV, FY26 goal vs actual (August report)
The one funnel-adjacent metric August did update. Blended LTV per student came in at $24,691 vs $27,652 forecast, driven by the MBA tuition redesign and the Cyber shutdown.
Media budget by program, FY27 May
Funnel levers by model year May
CPL and lead-to-enroll as set in the May models.
Break-even
From the August re-forecast. Annual break-even is the first fiscal year a program covers its own costs; payback is the first year cumulative surplus turns positive (measured from FY26).
Peak cumulative investment by program, FY26-FY31
Break-even detail
Version history
Three versions to date. Each model drop from the team becomes a version; figures and assumption changes are tracked version over version.
Net surplus trajectory across versions
Consolidated net surplus, FY26 through FY32. Dec 2025 and May 2026 are plan; Aug 2026 starts from the FY26 actual.
Aug 2026May 2026Dec 2025
Key variances, May 2026 vs Aug 2026
Total with Aviation. The August cut reflects FA26 under-enrollment (63 vs 92 goal), the Cyber shutdown, the MBA tuition redesign, and SP27/SU27 held at 80 percent of target.
Chassis note. The August re-forecast was built on the December 2025 straight-line chassis rather than the May cohort-matrix model, and its own term table assigns summers to the next fiscal year. This dashboard holds to the standing convention (FY27 = FA26 + SP27 + SU27), which the August headline tables also use, so figures here tie to those headline tables. Standing data rule: Moravian's FY closes July 1, so closed fiscal years must be reported as actuals only; modeled figures for a closed year are flagged, never presented as results.